Iowa

26-21 Gre853129D (Greene)

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

Agriculture and Land Stewardship

Keywords

Wetland

Performance State

IA

Posted

Mon, November 23, 2026

Response Deadline

Wed, December 30, 2026

Description

Completion Dates: Construction: November 1st, 2027 Seeding: December 15, 2027 (must follow the seeding period) This project is for a traditional breakpoint nutrient reduction wetland. In general, the work involves, but is not limited to, selective clearing, excavation, grading, steel sheetpile installation, tile installation, water control structure and seeding. This project includes about 62,120 cubic yards of earthwork, installation of 1,044 square feet of steel sheetpile, Aluminum CMP water control structure, 814 linear feet (LF) of tile installation, 57 LF of Aluminum CMP drawdown pipe, 2 Aluminum CMP inlet risers, 618 tons of riprap, 104 cubic yards of concrete grout and 23.1 acres of seeding. The estimated construction cost range for this project is $475,000 to $575,000.

Similar open contracts