Iowa

26-18 Sto842436B (Story)

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

Agriculture and Land Stewardship

Keywords

wetland · wetlands · tile · solar · excavation · grading · concrete · pump · riprap

Performance State

IA

Posted

Mon, November 23, 2026

Response Deadline

Wed, December 30, 2026

Description

Completion Dates: Construction November 1, 2027 Seeding December 15, 2027 (must follow seeding dates stipulated in the Specifications) In general, the work includes constructing a wetland that will treat the water from an existing drainage district tile and ditch using a solar panel powered pump. The project includes, but is not limited to, selective clearing, excavation and grading, inlet and outlet concrete structures, solar-powered pump installation, installation of pipe, riprap placement, and seeding. This project includes around 13,900 total cubic yards of earthwork, 1,875 linear feet of pipe installation, 20 tons of riprap, Modified SW-513 concrete inlet structure, Modified SW-513 concrete outlet structure, modified SW401 concrete manhole, modified SW401 pump basin, solar pump system and 27.3 acres of seeding. The estimated construction cost range for this project is $175,000 to $275,000.

Similar open contracts