26-18 Sto842436B (Story)
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Completion Dates: Construction November 1, 2027 Seeding December 15, 2027 (must follow seeding dates stipulated in the Specifications) In general, the work includes constructing a wetland that will treat the water from an existing drainage district tile and ditch using a solar panel powered pump. The project includes, but is not limited to, selective clearing, excavation and grading, inlet and outlet concrete structures, solar-powered pump installation, installation of pipe, riprap placement, and seeding. This project includes around 13,900 total cubic yards of earthwork, 1,875 linear feet of pipe installation, 20 tons of riprap, Modified SW-513 concrete inlet structure, Modified SW-513 concrete outlet structure, modified SW401 concrete manhole, modified SW401 pump basin, solar pump system and 27.3 acres of seeding. The estimated construction cost range for this project is $175,000 to $275,000.