26-19 Sac883604A (Sac)
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Completion Dates: Construction November 1st, 2027 Seeding December 15, 2027 (must follow seeding dates stipulated in the Specifications) In general, the work includes constructing a wetland that will treat the water from an existing ditch using a solar panel powered pump. The project includes, but is not limited to, selective clearing, excavation and grading, along with tile and outlet structures, lift station with solar-powered pump, tile installation, riprap placement, and seeding. This project includes around 7,800 total cubic yards of earthwork, 726 linear feet of pipe installation, 67 tons of rock, 140 tons of trench stabilization material, installation of a Modified SW-401 concrete outlet structure, two-chamber water control structure, lift station with pump assembly and solar panels, 738 LF of straw wattle and 4.9 acres of seeding. The estimated construction cost range for this project is $175,000 to $275,000.