Iowa

26-14 Sto822305D (Story)

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

Agriculture and Land Stewardship

Keywords

Wetland

Performance State

IA

Posted

Tue, November 10, 2026

Response Deadline

Thu, December 10, 2026

Description

In general, the work includes constructing a wetland that will treat the water from an existing ditch using a solar panel powered pump. The project includes, but is not limited to, selective clearing, excavation and grading, along with tile and outlet structures, pump installation, tile installation, riprap placement, and seeding. This project includes around 36,170 total cubic yards of earthwork, 1,469 linear feet of pipe installation, 43 tons of riprap, installation of a Modified SW-513 concrete outlet structure, SW-402 pump basin, solar pump system and 11.5 acres of seeding. The estimated construction cost range for this project is $240,000 to $360,000. Completion Dates: Construction September 1, 2027 Seeding December 15, 2027 (must follow seeding dates stipulated in the Specifications)

Similar open contracts