Traffic Signal Left Turn Phasing at Millbrook and Alluvial
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The scope of work includes but is not limited to; the modification of the left turn phasing in all four directions at the intersection of N. Millbrook Avenue and E. Alluvial Avenue. The work will consist of installing new traffic signal poles, detector loops, high visibility crosswalk, advanced stop bars, ADA compliant curb ramps, conflict markings, pedestrian countdown heads and APS ITS infrastructure. SEE BID SPECIFICATIONS FOR FULL DETAILS
Similar open contracts
HSIP Cycle 11 – Citywide Signal Modernization Project
Provide traffic control; Install 2-inch reflective yellow tape on existing traffic signal head backplate for enhanced visibility; replace pedestrian push buttons with current standard devices; remove …
Traffic Signal Modernization - Rancho Vista Blvd and Sierra Hwy.
The Project includes, without limitation, furnishing all necessary labor, materials, equipment, and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more spec…
Professional Services for Fair Oaks Avenue Signalization at Three Locations
A. INVITATION The City of Sunnyvale (the “City”) is seeking Proposals from qualified consultants to perform an analysis on the following three intersections along Fair Oaks Avenue to evaluate and reco…
Safe Streets for All (SS4A) Phase 1
The City of Charlotte seeks to implement systemic Vision Zero strategies to reduce risky behaviors through infrastructure improvements, with a focus on intersections and pedestrian-involved crashes. P…
IFB 05 4101 27 Richmond Rd and Lafayette St Corridors Signal and Pedestrian Improvement, UPC #115418 & #115503 VDOT Project #0060-137-176 & #0005-137-175
The project was developed under UPC: #115418, #115503 State Project Number 0060-137-176,0005-137-175 with funding allocations from Virginia Department of Transportationâs Smart Scaleprogram. This pr…
SS4A Package 1: STM Scope
Project Description: New curb ramps, some sidewalk repair and traffic signal improvements, including new pushbuttons. For the purpose of the Bidder Subcontractor list, this project includes rebar inst…