Safe Streets for All (SS4A) Phase 1
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The City of Charlotte seeks to implement systemic Vision Zero strategies to reduce risky behaviors through infrastructure improvements, with a focus on intersections and pedestrian-involved crashes. Project features included under the Safe Streets for All (SS4A) Phase 1 are rectangular rapid flashing pedestrian beacon, accessible pedestrian signal upgrades, lead pedestrian interval signal upgrades, concrete curb ramps, concrete sidewalk, concrete curb & gutter, milling, concrete island, concrete pedestrian refuge and pavement markings. Bid Submissions must be made using the Bonfire Procurement Portal: https://charlottenc.bonfirehub.com/opportunities/252097
Similar open contracts
HSIP Cycle 11 – Citywide Signal Modernization Project
Provide traffic control; Install 2-inch reflective yellow tape on existing traffic signal head backplate for enhanced visibility; replace pedestrian push buttons with current standard devices; remove …
This contract will support the design of all project phases for geometric safety improvements, traffic engineering, intelligent transportation systems, and street lighting engineering and upgrades.
This contract will support the design of all project phases for geometric safety improvements, traffic engineering, intelligent transportation systems, and street lighting engineering and upgrades.
Planning Services for Kershaw County Safe Streets and Roads for All Safety Action Plan
Kershaw County seeks the services of a firm, partnership, joint venture or team experienced in multimodal transportation planning and engineering to develop a Safe Streets and Roads for All (SS4A) Saf…
Professional Services for Fair Oaks Avenue Signalization at Three Locations
A. INVITATION The City of Sunnyvale (the “City”) is seeking Proposals from qualified consultants to perform an analysis on the following three intersections along Fair Oaks Avenue to evaluate and reco…
Traffic Signal Left Turn Phasing at Millbrook and Alluvial
The scope of work includes but is not limited to; the modification of the left turn phasing in all four directions at the intersection of N. Millbrook Avenue and E. Alluvial Avenue. The work will cons…
SS4A Package 1: STM Scope
Project Description: New curb ramps, some sidewalk repair and traffic signal improvements, including new pushbuttons. For the purpose of the Bidder Subcontractor list, this project includes rebar inst…