Traffic Signal Modernization - Rancho Vista Blvd and Sierra Hwy.
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The Project includes, without limitation, furnishing all necessary labor, materials, equipment, and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the Engineer and/or his designee. The work may consist of but is not limited to: The rewire of the entire traffic signal to the ten-foot head terminal compartment from the traffic signal controller cabinet to all the poles at the intersection. This also included the rewire of the luminaire wire from service cabinet to all poles. Existing traffic signal operation shall be maintained during the installation. The work shall be completed in 20 working days.
Similar open contracts
Rancho Vista Blvd ADA Improvements and Sidewalk Gap Closure
The Project for sidewalk repair and ADA improvements includes, without limitation, furnishing all necessary labor, materials, equipment, and other incidental and appurtenant work necessary to satisfac…
HSIP Cycle 11 – Citywide Signal Modernization Project
Provide traffic control; Install 2-inch reflective yellow tape on existing traffic signal head backplate for enhanced visibility; replace pedestrian push buttons with current standard devices; remove …
Professional Services for Fair Oaks Avenue Signalization at Three Locations
A. INVITATION The City of Sunnyvale (the “City”) is seeking Proposals from qualified consultants to perform an analysis on the following three intersections along Fair Oaks Avenue to evaluate and reco…
Traffic Signal Left Turn Phasing at Millbrook and Alluvial
The scope of work includes but is not limited to; the modification of the left turn phasing in all four directions at the intersection of N. Millbrook Avenue and E. Alluvial Avenue. The work will cons…
Hazel Avenue at US 50 Interchange Improvement Project - Segment 1
The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more speci…
PAVE MORE NOW Bid Package S-2.1 Bullard & Forkner Traffic Signal Project
(a) It is the purpose and intent of these Specifications to describe the minimum requirements of this procurement. (b) All items not specifically mentioned which are required for a complete unit shall…