CBTC Annex Automotive Program Expansion
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The scope of work includes renovation of existing CBTC Annex building and includes the division of an existing classroom into a smaller classroom and a new office with windows out to the garage. he scope also includes the replacement of two (2) garage doors, a new garage door in a new opening, a new covered and secure outdoor storage area, new exhaust reels and compressed air hoses for two (2) new vehicle lifts. Additional work includes painting, electrical upgrades, lighting upgrades, an EV Charger, a new air compressor with additional piping, improved ventilation systems, and three (3) new HVLS fans.
Similar open contracts
260-B4260-058 NVCC Renovate 3rd Floor Lab
The scope of this project can generally be described as the reconfiguration of CM311 and CM365 into a new classroom lab. Scope includes selective demolition of existing partition wall that separates r…
Green Road Community Center HVAC Renovations
The Project consists generally of the following major items: 1. Remove and replace six packaged units and one split system for a total of 57 tons. 2. Clean existing ductwork on existing units. 3. Prov…
AMC-0174 OWB ATCT Public Announcement
Project electrical work consists of rerouting down conductors, ground tests, arc flash study, and SPD replacement. Roof work includes replacing 3 roofs (CAB and shaft) with EPDM membrane, replacing ro…
ITB No. 26-2989-8EAR - Water Treatment Facility - HVAC Improvements
The Work consists of all work required by the Construction Documents necessary for the HVAC Improvements project at the Henrico County Department of Public Utilitiesâ Water Treatment Facility (WTF) …
27-85-3362SH Expansion to the Hanover Center for Trades and Technology
The project is generally described as providing all labor, materials, supplies, tools, equipment, transportation and all incidentals required and/or implied for the complete and satisfactory performan…
South Campus HVAC Upgrades
The existing HVAC equipment, as indicated in project documents, is at the end of its statistical life expectancy and has become maintenance intensive. This project will replace two aging chillers (31…