North Carolina

South Campus HVAC Upgrades

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

ROWAN-CABARRUS COMMUNITY COLLEGE

Performance State

NC

Posted

Tue, July 14, 2026

Response Deadline

Thu, September 10, 2026

Description

The existing HVAC equipment, as indicated in project documents, is at the end of its statistical life expectancy and has become maintenance intensive.  This project will replace two aging chillers (31 and 24 years), which serve the entire campus, with a modular chiller solution to minimize general construction impact. The project will also replace both the S201 and adjacent S202 building air handling units that are original to the buildings and beyond anticipated life. Replace remaining pneumatic controls, which are no longer well supported, will be replaced with direct digital controls. The Building Automation System software will also be upgraded to the College standard to enhance operation of the system.

Similar open contracts

NC

Green Road Community Center HVAC Renovations

The Project consists generally of the following major items: 1. Remove and replace six packaged units and one split system for a total of 57 tons. 2. Clean existing ductwork on existing units. 3. Prov…

CITY OF RALEIGHPerformance: NCDue Sep 22, 2026Posted Aug 21, 2026
CA

MSH Central Kitchen Air Conditioning

Major components of Project Work consist of installing supplemental cooling for the Central Kitchen, which will include two (2) new outdoor air conditioning units with piping and supports, eight (8) n…

Department of State HospitalsPerformance: CADue Oct 12, 2026Posted Aug 28, 2026
SC

NETC Cheraw Campus - Boiler/Chiller Upgrades

Provide and install piping and power for owner provided and installed modular boiler/chiller plant and cooling tower. Connect piping from plant to existing piping serving three campus buildings.

Northeastern Technical CollegePerformance: SCDue Sep 24, 2026Posted Aug 12, 2026
Category: Construction
SC

HVAC System Replacement for North Road Recreation Complex

The City of Orangeburg is seeking HVAC system replacement for North Road Recreation Complex. This RFP is for a full replacement of the HVAC systems for both Quad 4 and Quad 5 buildings. The buildings …

City of OrangeburgPerformance: SCDue Oct 2, 2026Posted Sep 4, 2026
Category: Maintenance/Repair
FED

Z1DA--Upgrade Chiller Plant Construction Northport - Project 632-25-101

Work includes general construction and alterations, of the existing chiller plant and includes the necessary removal of existing building components, systems, construction and installation of certain …

VETERANS AFFAIRS, DEPARTMENT OFPerformance: NYDue Sep 15, 2026Posted Aug 19, 2026
Set-Aside: SDVOSBCNAICS Code: 236220PSC Code: Z1DASolicitation Type: Solicitation+3
NC

Beam Administration Building AHU Redesign

Provide and install mechanical, electrical and plumbing equipment in the Beam Administration building to remove the steam powered heating system and provide a hot water heating system. The air handler…

GASTON COLLEGEPerformance: NCDue Sep 17, 2026Posted Aug 24, 2026