South Campus HVAC Upgrades
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The existing HVAC equipment, as indicated in project documents, is at the end of its statistical life expectancy and has become maintenance intensive. This project will replace two aging chillers (31 and 24 years), which serve the entire campus, with a modular chiller solution to minimize general construction impact. The project will also replace both the S201 and adjacent S202 building air handling units that are original to the buildings and beyond anticipated life. Replace remaining pneumatic controls, which are no longer well supported, will be replaced with direct digital controls. The Building Automation System software will also be upgraded to the College standard to enhance operation of the system.
Similar open contracts
Green Road Community Center HVAC Renovations
The Project consists generally of the following major items: 1. Remove and replace six packaged units and one split system for a total of 57 tons. 2. Clean existing ductwork on existing units. 3. Prov…
MSH Central Kitchen Air Conditioning
Major components of Project Work consist of installing supplemental cooling for the Central Kitchen, which will include two (2) new outdoor air conditioning units with piping and supports, eight (8) n…
NETC Cheraw Campus - Boiler/Chiller Upgrades
Provide and install piping and power for owner provided and installed modular boiler/chiller plant and cooling tower. Connect piping from plant to existing piping serving three campus buildings.
HVAC System Replacement for North Road Recreation Complex
The City of Orangeburg is seeking HVAC system replacement for North Road Recreation Complex. This RFP is for a full replacement of the HVAC systems for both Quad 4 and Quad 5 buildings. The buildings …
Z1DA--Upgrade Chiller Plant Construction Northport - Project 632-25-101
Work includes general construction and alterations, of the existing chiller plant and includes the necessary removal of existing building components, systems, construction and installation of certain …
Beam Administration Building AHU Redesign
Provide and install mechanical, electrical and plumbing equipment in the Beam Administration building to remove the steam powered heating system and provide a hot water heating system. The air handler…