Dubuque, IA

2026-2027 Snow and Ice Removal From Public Sidewalks

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

Dubuque

Category

Building Maintenance, Materials, Supplies, and Services · Backfill: Gravel, Dirt, Rock, Sand, and Topsoil Supplies and Services · Cleaning, Custodial, and Janitorial: Equipment, Products, and Supplies · Cleaning Services: Commercial, Custodial, Janitorial · Coverings, Awnings, and Window Shades: Equipment, Supplies and Services · Demolition, Site Cleanup, Removal, and Restoration: Equipment, Supplies, and Services · Door, Glass, and Window: Equipment, Supplies, and Services · Electrical Distribution: Lighting, Equipment, Fixtures, Parts, Utility, Supplies, and Systems · Elevator and Lift: Equipment, Machines, and Supplies (Carts, Hand Trucks, Dollies) · Excavating: Equipment, Machinery, Supplies, and Services · Exterior Finishing: Equipment, Products, and Supplies (Gutters, Siding, and Fencing) · Flooring: Carpet, Hardwood, Laminate, Rugs, Tile, Vinyl, Coverings - Equipment, and Supplies · Grounds, Landscape, Lawn Maintenance: Equipment, Machinery, and Supplies · HVAC: Equipment, Machinery, and Supplies (air condition, heating, refrigerants, ventilation etc.) · Interior Finishing: Equipment, Products, and Supplies (Cabinetry, Countertops, Partitions, Stairs, Trim) · Locks, Keys, and Locksmith Services · Masonry, Stone, and Block: Equipment and Supplies · Non-assembled Materials: Drywall, Fasteners, Lumber, Metals, Paint, Protective Coatings, Sealants, and Supplies · Pre-assembled/formed: Frames, Insulation, Metal, Molding, Fiberglass, Plastics, and Plexiglas · Paving, Concrete, Asphalt, Rock: Equipment and Supplies

Performance State

IA

Posted

Thu, November 5, 2026

Response Deadline

Thu, November 19, 2026

Description

Notice of Request for Bid Project Description: The Contractor shall be available upon request by the City to remove snow and ice from sidewalk locations throughout the City within 24 hours of notification. This work will be requested as needed when the City receives a complaint that a property owner has not cleared the public sidewalk within 48 hours after a snow event.  The Engineer's opinion of probably cost is: Dependent on Contractor rates of winning low bid and snow precipitation for season.

Similar open contracts