Engine #2 Tank Removal
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The Contractor shall develop, implement, maintain, and supervise as part of the work, a comprehensive plan for tank removal and related operations. The work consists of removal, decontamination and disposal of underground storage tank, associated piping and ancillary equipment as well as backfilling & restoring/seeding of the area. The Work Plan shall be based on work experience, on the guidance provided in this specification. The Contractor shall have a minimum of 2 years of tank removal experience and shall be certified by the State of Connecticut for tank removal work.
Similar open contracts
Fuel Tank Removal and Replacement, Colebrook River Lake, Colebrook, CT
The U.S. Army Corps of Engineers � New England District is issuing a Solicitation Notice for Fuel Tank Removal and Replacement, Colebrook River Lake, Colebrook, CT. THE WORK CONSISTS OF: The Contracto…
Repair Water Tanks 1511 & 1512
This project includes demolition of existing Water Tanks 1511 and 1512 and construction of new Water Tank 1513 and associated piping. It also includes replacement of the two existing duty Pumps #1 and…
Ridge Route Tank Relining Project
The project generally consists of relining of the Ridge Route Tank. The work includes, but is not limited to, surface preparation and application of protective coatings to all specified interior surfa…
JBMDL - Above and Underground Tank Maintenance and Repair
The contractor shall provide labor, equipment, materials and tools to inspect, test, certify, and repair to maintain 12 Underground Storage Tanks (USTs) and 7 Aboveground Storage Tanks (ASTs) at Joint…
JBMDL - Above and Underground Tank Maintenance and Repair
The contractor shall provide labor, equipment, materials and tools to inspect, test, certify, and repair to maintain 12 Underground Storage Tanks (USTs) and 7 Aboveground Storage Tanks (ASTs) at Joint…
Auxiliary Drains at I-66 Landfill
The Contractor shall provide all labor, supervision, materials, new equipment, permits, inspections, and technical expertisenecessary to remove existing components, including electrical connections wh…