Auxiliary Drains at I-66 Landfill
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The Contractor shall provide all labor, supervision, materials, new equipment, permits, inspections, and technical expertisenecessary to remove existing components, including electrical connections where required, and furnish and install new fireprotection equipment. Contractor shall field verify all dimensions, existing conditions, piping arrangements, equipment locations,and system configurations prior to installation. The scope of work includes, but is not limited to, the items described herein. TheContractor shall deliver a complete and fully operational system, including all materials, fittings, couplings, supports, hangers, trim,and accessories required for a complete installation, whether specifically listed or not.
Similar open contracts
Pre-Qualification for Prima Zone 4 Phase A Main Gas Line Project
The project consists of design, permitting, and construction of the Zone 4 Phase A Landfill Gas (LFG) Collection and Control System (LFGCCS) header installation. Work to include trenching, installatio…
Kiefer Landfill- Module 5, Phase 1 Liner Construction
The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more speci…
Work Order Engineering Services for Solid Waste Landfill Systems
The purpose of this contract is to provide engineering and related services on a work order basis for King County Department of Natural Resources and Parks, Solid Waste Division (“County”). The exact …
Regional Water Recycling Plant No. 5 (RP-5) Offsite Facilities Project
This project consists of all materials, labor, tools, equipment, apparatus, facilities, transportation and incidentals necessary to furnish, install, commission, start up and deliver a complete and fu…
Kiefer Landfill Basin Discharge Piping
The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more speci…
Lift Station #46 Rehabilitation
The Scope of Work for the Lift Station #46 Rehabilitation includes, but is not limited to: A. Discharge Piping : Replace existing discharge piping and risers. B. Wet Well Rehabilitation : Clean, repai…