Pre-Qualification for Prima Zone 4 Phase A Main Gas Line Project
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The project consists of design, permitting, and construction of the Zone 4 Phase A Landfill Gas (LFG) Collection and Control System (LFGCCS) header installation. Work to include trenching, installation of new HDPE header piping, associated valves and appurtenances, tie-ins to existing LFG infrastructure, backfilling, testing, and restoration of disturbed areas. Contractors should account for site constraints including traffic control, construction sequence, coordination with landfill operations, subcontractor scheduling, and materials procurement. Completed work will provide the owner with improvements to the LFGCCS, including the fully installed Zone 4 Phase A header and associated connections to the existing LFG infrastructure, with the requirement that the contractor avoid damage to any existing infrastructure not designated for demolition and removal.
Similar open contracts
Auxiliary Drains at I-66 Landfill
The Contractor shall provide all labor, supervision, materials, new equipment, permits, inspections, and technical expertisenecessary to remove existing components, including electrical connections wh…
Kiefer Landfill- Module 5, Phase 1 Liner Construction
The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more speci…
Route 82 Water Main Lining
Project Description The work required under this contract includes but is not limited to the following: 1. Furnishing, installing, and maintaining all barricades, signing, and maintenance and protecti…
Kiefer Landfill Basin Discharge Piping
The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more speci…
Lift Station #46 Rehabilitation
The Scope of Work for the Lift Station #46 Rehabilitation includes, but is not limited to: A. Discharge Piping : Replace existing discharge piping and risers. B. Wet Well Rehabilitation : Clean, repai…
Regional Water Recycling Plant No. 5 (RP-5) Offsite Facilities Project
This project consists of all materials, labor, tools, equipment, apparatus, facilities, transportation and incidentals necessary to furnish, install, commission, start up and deliver a complete and fu…