Project Description The work required under this contract includes but is not limited to the following: 1. Furnishing, installing, and maintaining all barricades, signing, and maintenance and protection of traffic measures as required to perform the work. 2. Furnish and install new insertion valves. 3. Furnish and install new water main lining, and appurtenances. 4. Excavate and support all excavations as required and in accordance with OSHA regulations. 5. All surface restoration, including the roadway pavement (temporary, permanent, and mill & overlay), curbs, sidewalks, pavement markings, and lawn re-establishment.
Similar open contracts
Water Line Replacement at Oakland and Santa Fe - CIP 5661 in CA
The scope of work generally consists of, but is not limited to the installation of approximately 8,200 linear feet of 16-inch C900 PVC water main, including all required fittings, valves, valve boxes,…
27005-3801, Macland Road WM Replacement
Principal Items of Work ¿ 1,199 L.F. of 16-inch D.I.P. (Pressure Class 250) Water Main and Appurtenances ¿ 234 L.F. of 24-inch Steel Casing (0.375" Wall Thickness) (Jack and Bore) ¿ 485 L.F. of Excav…
US HIGHWAY 1 - 12” WATER MAIN EXTENSION
The work to be done consists of the following approximate quantities: 14,102 LF of 12" DIP Water Main, 2,476 LF of 12" RJ DIP Water Main, 170 LF of 12" RJ DIP Water Main Installed in Casing, 134 LF of…
Airport Road Wastewater Improvements (61WW2101C)
The major work shall generally consist of but is not limited to all labor, materials, equipment, appurtenances, and incidentals as required to properly install, complete and be accepted in place the A…
Elloree Waterline Replacement Project
DIV I Base Bid: install approx 3,500 LF of 8” watermain to replace ex. waterlines, replacement of 5 FHs. DIV II – Alt. A - install 2,700 LF 8” to replace ex. waterlines, replacement of 3 FHs. DIV III …
Water Line Replacement at Oakland and Santa Fe – CIP 5661, CA
The work includes C900 PVC water main, ductile iron fittings, valves, valve boxes, hydrants, water services, blow-offs, air/vacuum assemblies, tie-ins, excavation/trenching, bedding, backfill, compact…