Ridge Route Tank Relining Project
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The project generally consists of relining of the Ridge Route Tank. The work includes, but is not limited to, surface preparation and application of protective coatings to all specified interior surfaces of the tank structure, including all attachments, appurtenances, and accessories; removal of all existing interior linings above the elevation of the overflow, columns and tank bottom while preserving and incorporating much of the tank shell with the application of an NSF ANSI Standard 61 certified immersion grade liner; removal and disposal of a corroded interior ladder with a Saf-T-Climb device and its replacement with a new fiberglass unit, complete with safety climb device; a limited amount of grinding of sharp edges that have resulted from corrosion; furnish and install a new welded steel ring halo; the removal and replacement of up to 5 roof structure rafters that have been consumed by corrosion; limited amount of weld repairs to deteriorated roof areas welds; and all associated work ("Work") as indicated in the Contract Documents
Similar open contracts
Avenue of the Oaks Tank 2 Tank Coating Project
The project generally consists of spot repair and overcoat painting of the exterior paint system and the complete interior relining of the Ave of the Oaks Tank 2. The work includes, but is not limited…
Olympian Tanks 1 and 4 Exterior Repainting Project
The project generally consists of removal and replacement of all existing exterior paint systems at Olympian Tanks 1 and 4. The work includes, but is not limited to, for tank 1: complete removal of al…
Route 82 Water Main Lining
Project Description The work required under this contract includes but is not limited to the following: 1. Furnishing, installing, and maintaining all barricades, signing, and maintenance and protecti…
UNITY TANK R-26-1438 DIVISION I & DIVISION II
DIVISION I: Clearing, grubbing, site grading, site work, site piping. DIVISION II: 120,000 Gallon Steel Ground Storage Tank and Foundation. This project is being funded by a grant from the SC Rura…
Engine #2 Tank Removal
The Contractor shall develop, implement, maintain, and supervise as part of the work, a comprehensive plan for tank removal and related operations. The work consists of removal, decontamination and di…
Rapid Infiltration Basins (RIBS) Rehabilitation: Three-Year Phasing
The RIB Rehabilitation Project scope of work includes the rehabilitation of deteriorated RIBs over a three (3) year period as described below: FY 2027 (Oct 1, 2026- Sept 27): Cells 66, 67, 68, 69, 70 …