Diversion Chamber C Inlet Pipe Modifications -WPCF
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Dewatering, cleaning, ground water control, CCTV, Cured-in-Place (CIPP) lining of located on the Water Pollution Control Facility (WPCF). Approximately 225 linear feet of 54-inch corrugated metal pipe (CMP) stormwater pipe. Approximately 105 linear feet of 12-inch reinforced concrete pipe (RCP) stormwater pipe. PREBID MEETING: 09/29/2026 - 10:00AM. ***DO NOT SUBMIT BIDS ELECTRONICALLY***