27-004-Potato Creek Sewer Rehabilitation
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
This sewer system rehabilitation project includes approximately 6,865 linear feet of cured-in-place pipe (CIPP) lining of existing gravity sewer mainlines composed of vitrified clay, concrete, and HDPE pipe. The project also includes repairs to approximately 177 service laterals. Manhole rehabilitation encompasses approximately 263 vertical feet of lining within predominantly brick manholes, ranging from full manhole lining to localized repairs, grouting, and rehabilitation of benches and inverts. This work is intended to reduce infiltration and inflow, restore structural integrity, and extend the service life of the existing wastewater collection system