Genoa Gravity Sewer Rehabilitation - Phase I
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Project Description: Project consists of the following: 1. Rehabilitation of approximately 4,750 LF of 6-18-inch gravity main via CIPP. 2. Relocation of approximately 610 LF of 8-inch gravity main via open cut. 3. Rehabilitation of 19 manholes. 4. Replacement of 3 manholes. 5. Genoa PS: Replacement of upper slide rail brackets and generator like-for-like. Installation of fall protection grating. Replacement of influent bar screen with new grinder. 6. Landfill PS: Installation of vent pipe on wet well and fall protection grating. 7. Grantham Middle and Grantham Elementary PSs: Installation of bypass connections. 8. Highway 117 PS: Installation of flow meter. 9. Project cost range is anticipated between $2,100,000 and $3,150,000.