HSIP - Intersection & Crosswalks - 2026
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
This project, RICN 2026-CT-025, Federal Aid Project No STP-HSIP(116), consists of 2.5 miles of roadway safety improvements on Pine Swamp Road (Rte. 114)/Wrentham Road (Rte. 121) in Cumberland, RI, including removal, disposal, and replacement of all guardrail, attenuators and other protective devices. Existing lane widths will be reduced from 12 feet to 11 feet and will include a centerline buffer that includes a mumble strip. Other roadway safety improvements include, but are not limited to, new signing, new striping, and delineators. Work also includes the installation of a new traffic signal at the intersection of Pine Swamp Road (Rte. 114)/Wrentham Road (Rte. 121)/Diamond Hill Road (Rte. 114) and the removal of existing slip lanes. The work will also include full width micro milling and overlay on a portion of Diamond Hill Road, pavement reduction at the new signalized intersection, a new STU, and all incidentals, complete in place and accepted.
Similar open contracts
HSIP Cycle 11 – Citywide Signal Modernization Project
Provide traffic control; Install 2-inch reflective yellow tape on existing traffic signal head backplate for enhanced visibility; replace pedestrian push buttons with current standard devices; remove …
Hazel Avenue at US 50 Interchange Improvement Project - Segment 1
The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more speci…
Nisqually Rd SW (Nisqually River to I-5 Northbound Ramp). CRP 5962
This project provides for the improvement of Nisqually Road Southwest from Nisqually River to I-5 Northbound Ramp by resurfacing the existing asphalt pavement and paved shoulder, replacing existing su…
Traffic Signal Left Turn Phasing at Millbrook and Alluvial
The scope of work includes but is not limited to; the modification of the left turn phasing in all four directions at the intersection of N. Millbrook Avenue and E. Alluvial Avenue. The work will cons…
Providence Pedestrian Bridge over Amtrak
This project consists of finishing the construction of the Pedestrian Bridge No. 130201 over Amtrak, repairing the concrete piers on Bridge No. 057901 Viaduct Ramp AC-AD, repairing the joint on Bridge…
Statewide Stormwater Improvements - PROTECT Grant
Rhode Island Contract No. 2026-CU-032, Federal Aid Project No. STP-PROT(005) for the Statewide Stormwater Improvements PROTECT Grant (the Project; STIP ID 7551) will construct 89 stormwater treatment …