Pre-Demolition Asbestos and Hazardous Materials Survey
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Identify, locate, and quantify other hazardous, toxic, universal-waste, or otherwise regulated materials that must be removed and managed separately before or during demolition. Deliver a written report, signed and sealed by the licensed inspector of identified toxic materials. Provide one electronic (PDF) copy and two bound hard copies. The report shall be suitable for inclusion in public bid documents without redaction.