Paukie Island Causeway Bank Stabilization
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Beaufort County plans to stabilize the eroding embankment slopes along both sides of the Paukie Island Road causeway, west of the existing tidal creek culvert, by installing about 560 linear feet of Envirolok vegetated shoreline protection (about 287 LF on the north side and 273 LF on the south side). The work consists of a geotextile bag wall built on a 1:1 batter, with a maximum exposed height of about 4 feet. It is reinforced with geogrid and has a wrapped aggregate drain behind it. The bags will be filled with a sand and topsoil blend, then hydroseeded with a salttolerant native seed mix and planted with sea oxeye. The disturbed marsh in front of the wall will be restored with smooth cordgrass plugs, giving a living shoreline that blends into the surrounding salt marsh. Because the work lies within the SCDES Bureau of Coastal Management critical area, construction will be scheduled around low tides and done under SCDES and U.S. Army Corps of Engineers permits.