San Lorenzo River Lagoon Culvert Debris Boom
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The San Lorenzo River seasonally shoals (closes) at its mouth, creating safety and environmental challenges for the adjacent neighborhood, beach, businesses, and nearby infrastructure. In 2025, a flood control culvert was constructed to reduce uncontrolled breaches and improve water quality for endangered fisheries. The project installed a dual-pipe drainage system designed to convey river water through the seasonal sandbar and discharge it to the ocean. This system reduces the need for mechanical breaching of the lagoon while improving water quality by removing high-salinity water from the lowest portion of the lagoon. By reducing the frequency of mechanical breaching, the project has proven to provide multiple benefits, including protection of public and private property, enhanced habitat conditions for endangered species such as tidewater goby and steelhead, and increased safety for recreational beach users. After the culvert became operational, an issue was identified with the specialized intake structures. These intakes are designed to allow continuous flow into the culvert while preventing fish from being harmed or impinged. However, because the screens have a fine mesh size, debris such as grass, small sticks, and trash can accumulate on the screens and reduce flow capacity. To address this issue, the City has designed a seasonal floating debris boom (Project) that will be installed around the intakes. The boom will intercept floating debris before it reaches the screens, helping keep the intake structures clear and ensuring the culvert system operates at full capacity during the summer months.