Hsip 11 & 12: Unsignalized Crossing Improvement Project
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The Project to be performed consists of furnishing all labor, materials, tools, equipment, and transportation required to complete the Project, with a scope of work to generally include, but is not limited to, the following: Installing concrete curbs, gutters, sidewalk, curb ramps, roadway signs, pedestrian activated beacons and striping and pavement markings. All other work not mentioned above that is required by the plans, City Standard Specifications, State Standard Specifications and the Special Provisions shall be performed, placed, constructed or installed