Mission Woods Force Main Replacement Project
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Johnson County Wastewater Mission Woods Force Main Replacement Project – Contract No. MTM1 C075 Scope of Work: The work consists of the following: Installation of approximately 1829 lineal feet of 8-inch diameter force main via horizontal directional drilling, installation of one (1) new 6-foot diameter pre-cast polymer concrete combination air release and meter vault, fitting assembly for function of new force main as shown on the drawings, installation of one (1) new 5-foot diameter combination air release valve, fitting assembly and precast polymer concrete vault for function of new force main as shown on the drawings, and installation of one (1) 4-foot diameter polymer concrete gravity manhole for connection to the existing downstream gravity sewer at the Mission Hills Country Club, 5400 Mission Dr, Mission Hills, KS 66208; abandonment of approximately 1833 lineal feet of existing 8-inch Cast Iron Force Main with flowable fill; abandonment of one existing air release valve vault; testing of the new force main; installation of pump station improvements as shown on the drawing including new meter vault, bypass connection, and drain line; removal of existing curb, trees, and pavement as necessary to construct new access drive to the existing pump station at 2001 Shawnee Mission Parkway, as shown on the drawings; and any other labor or materials necessary to provide pump station improvements and a fully functioning force main and complete restoration of the site to the satisfaction of the Owner. All bids and questions shall be submitted electronically on IonWave.