Reno, NV

2027 Permanent Patch Program

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

City of Reno

Solicitation #

CP-2026-32

Department

Public Works

NIGP Code

0020 · 0027 · 0029 · 0036 · 0059 · 0062

License Required

Contractor License, City of Reno Business License

Estimated Value

$2.1-2.3mil

Performance State

NV

Posted

Tue, October 27, 2026

Response Deadline

Thu, November 12, 2026

Description

<p>The saw cutting of the outline of the patch area, removing temporary patches and a portion of the base</p><p>material, as necessary, or as ordered from prior utility cuts, compacting base material within the trench</p><p>to the bottom elevation of the permanent A.C. patch, tacking the edges of the cuts, locating and raising</p><p>of manholes, vaults, water or gas valves, and survey monuments, removal and reconstruction of vehicle</p><p>detection loops, placing and compacting A.C. pavement material within the limits of the area prepared</p><p>and repainting of pavement markings and striping, along with all other appurtenant work necessary to</p><p>complete the work specified. In some instances, removal of the existing asphalt pavement by milling to</p><p>a two inch depth in the vicinity of the patch area and subsequent overlay repaving will be required.</p> <p>Proposals via PlanetBids will be received until 2:00 P.M. Local Time on THURSDAY, NOVEMBER 12,</p><p>2026, for Contract Number F100149. A virtual meeting for opening of bids will be held at 2:15P.M. Local</p><p>time. To attend, please use the following Microsoft Teams Meeting:</p><p>Meeting ID: 236 965 311 602 748 6</p><p>Passcode: Yn6Ww9Bq</p><p>Call-In Number: +1 312-754-8784, 868880459#</p><p>Said Proposal shall include all labor, tools, implements, machinery, materials, and any incidentals</p><p>necessary to complete the work in the manner and time prescribed, and in strict conformity with the</p><p>Contract Documents to the satisfaction of the City Engineer. In general, the major work items include:</p><p>The saw cutting of the outline of the patch area, removing temporary patches and a portion of the base</p><p>material, as necessary, or as ordered from prior utility cuts, compacting base material within the trench</p><p>to the bottom elevation of the permanent A.C. patch, tacking the edges of the cuts, locating and raising</p><p>of manholes, vaults, water or gas valves, and survey monuments, removal …

Similar open contracts