Section 219 Chesterton Interceptor Rehab
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
This Pre-Solicitation Notice is being issued by the United States Army Corps of Engineers - Chicago District to inform interested contractors of the District intent to issue a solicitation for the Section 219 Chesterton Interceptor Rehab, Chesterton, Indiana.****PROJECT INFORMATION: Under the contract, the contractor will be required to provide the following construction services: the construction work includes relining approximately 3,217 linear feet of an existing 48-inch trunk sewer with a 42-inch slipliner pipe (comprising approximately 2,368 linear feet of Base Work and 849 linear feet of Option Work). The work involves specialized insertion pits (using two insertion pits), sewer cleaning, televising, proofing, sliplining, annulus grouting, sewer lateral reinstatement, maintenance of traffic, and temporary erosion and sediment control. Contracted personnel must be trained, certified, and equipped for all safety operations in accordance with (IAW) U.S. Army Corps of Engineers EM 385-1-1 standards.The Chesterton Interceptor is located along 8th Street, spanning from 8th Street and Morgan Avenue to the wastewater treatment plant on League Lane in Chesterton, Indiana.****CONTRACTING OFFICE: USACE Chicago District, 231 South LaSalle Street, Suite 1500, Chicago IL 60604****ACQUISITION INFORMATION: Competition for this acquisition is RESERVED EXCLUSIVELY for Small Business Concerns (100% Small Business Set-Aside). The North American Industry Classification System (NAICS) Code is 237990 (Other Heavy and Civil Engineering Construction), with an SBA small business size standard of $45.0 Million. The magnitude of cost for construction is estimated between $1,000,000.00 and $5,000,000.00. The solicitation package (RFP) is planned for advertisement in November 2026.The solicitation will be downloadable from the internet only via the Procurement Integrated Enterprise Environment (PIEE). The project specification and drawing files are PDF files and can be viewed, navigated, o…