Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Install two diversion structures across the full width of the 25’ concrete channel. Excavate 8-10 feet below the channel floor to form each structure (approx. 8’ x 25’). Install steel grates over structures. Provide wall-mounted steel gates. Install 4’ diameter discharge pipelines. Route piping across the gravel access road and basin slope. Construct concrete outlet structures in the basins for flow dissipation. Install piping along basin slopes. Provide all electrical, instrumentation, and SCADA controls integration.