Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Work includes rehabilitation of covered and open concrete structures; relining, modification, or replacement of small and large diameter steel and ductile iron pipes and their associated pipe supports; replacement or installation of valves and piping appurtenances and their associated electrical and instrumentation scope; installation and operation of a temporary 11 MGD pumped bypass; rehabilitation of reactor mixer and aerator; installation of new or improvements to existing instrumentation and their associated electrical and instrumentation scope; rehabilitation and replacement of motor control center components; modifications to existing sluice gates and installation of new slide gates; installation of platforms and access improvements to open concrete structures; rerouting of sump pump discharge lines; excavation and trench work; and surveying of key points in and around the reactors.