The general scope of work includes site improvements, including grading, paving, sidewalks, concrete flatwork, accessibility improvements, and utility infrastructure. Also, selective demolition of exi…
The Project consists of construction of approximately 4,800 LF of 12 inch waterline, connections to existing system, and associated appurtenances.
Amendment 001: Posted 10/06/2026 - Changes Site Visit date from Thursday, October 22, 2026 to Thursday, October 29, 2026. Adds Project Spatial Data zip files. See attachments for SF30 with amended sol…
Amendment 001: Posted 10/06/2026 - Changes Site Visit date from Thursday, October 22, 2026 to Thursday, October 29, 2026. Adds Project Spatial Data zip files. See attachments for SF30 with amended sol…
The work under this Project generally consists of installing pedestrian facilities on both sides of Little Back River Road: an asphalt Shared-Use Path on the West side between Lamington Road and Oakvi…
PCI requests pricing for the following scopes: Traffic controls, paving, aggregate, ready mix, rebar, trucking, and misc. metal fabrication. Link to Bid Documents: Requirements: N/A PCI is an equal o…