TX FW LGA 10(5) Steve Thompson Wildlife Drive
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILBLE PROJECT NUMBER: TX FW LGA 10(5) PROJECT NAME: STEVE THOMPSON WILDLIFE DRIVE PROJECT DESCRIPTION: The proposed project includes full depth reclamation of existing driving surface which includes chip seal material, and existing gravel. After completing full-depth reclamation new aggregate surface course will be added to create a driving surface that has a consistent width. The project also includes installation of aluminum gate and a small concrete pad and safety improvement signs and speed bumps. The project includes three alternate bid items for Aggregate Surface Course (TON) with one being awarded. Alternate 1: 2-inches of aggregate surface course added to Bayside Drive and Steve Thompson Wildlife Drive and terminating at Renee�s Overlook Parking Area. Alternate 2: 2-inches of aggregate surface course added to Bayside Drive and Steve Thompson Wildlife Drive. Alternate 3: 3-inches of aggregate surface course added to Bayside Drive and Steve Thompson Wildlife Drive and terminating at Renee�s Overlook Parking Area. PRINCIPAL WORK ITEMS: The project includes the following work items: Full Depth Reclamation (MILE) � 13 MILE Aggregate Surface Course (TON) � 11,000 TON ANTICIPATED SCHEDULE: The anticipated advertisement date is September 2026 with construction beginning in January 2027, and project completion in August 2027. ORDER OF MAGNITUDE: The proposed project cost ranges between $2,000,000 and $5,000,000.
Similar open contracts
OK FW TSM 10(1) NFH Entrance Road and Parking Improvements
THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE Small Business Set-Aside PROJECT NUMBER: OK FW TSM 10(1) PROJECT NAME: NFH Entrance Road and Parking Improvements PROJECT D…
FY2026 GTIB Paving Improvements
The project will consist of 3,446 SY of Graded Aggregate Base and driveway piping for a new road, 1,694 SY of variable depth milling, 938 SY of Full Depth Reclamation, 37 SY of patching, 3,343 Tons of…
2027-39
This project consists of the construction of approximately 0.67 miles of new roadway along Magnolia Road in Tattnall County, generally following the existing unpaved alignment. The proposed roadway pr…
220011 4700 Area Paving STREETS
Please note this project (as stated int the ITB) has a MANDATORY SITE VISIT AND PRE-BID MEETING: General Project Description (See SCOPE OF WORK for complete details): The work generally consists of: R…
Lamar County 2026 LMIG Resurfacing Project
This is an invitation to submit a bid to Lamar County for the 2026 LMIG-TSPLOST Project (Midway Road, Freeman Road, Shadybrook Lane, Ponderosa Lane and South 6th Street Ext.) as indicated herein. Seal…
220015 CBJTC 4700 Area Paving -AVENUES
Please note, this project has a MANDATORY SITE VISIT AND PRE-BID MEETING as stated in the ITB. General Project Description (See SCOPE OF WORK for complete details): The work generally consists of: Rep…