This project consists of the construction of approximately 0.67 miles of new roadway along Magnolia Road in Tattnall County, generally following the existing unpaved alignment. The proposed roadway provides improved access to adjacent residential and agricultural properties and establishes a connection to U.S. Highway 280 to improve local mobility and connectivity. The roadway section includes 10-foot paved travel lanes with 2-foot shoulders and approximately 18-foot-wide roadside drainage ditches designed to convey stormwater runoff toward a 36-inch cross-drainage structure located beneath Curve #2. The project also includes the installation of fourteen paved driveway connections and associated driveway drainage pipes to maintain access and drainage continuity. Construction quantities include approximately 9,586 square yards of graded aggregate base course (GAB) and 1,617 tons of asphalt pavement. Most of the roadway will receive asphalt surfacing, with the final roadway segments transitioning to GAB surfacing. All work shall conform to the Georgia Department of Transportation¿s (GDOT) Standard Specifications Construction of Transportation Systems, 2021 Edition; GDOT¿s Supplemental Specifications Construction of Transportation Systems, 2021; and all applicable GDOT Standards and Details; and other contract requirements, specifications and general conditions. ***SEE ATTACHED BID REQUEST**
Similar open contracts
2027-38 2026 LRA/2027 LMIG
Tattnall County is soliciting bids on resurfacing of approximately 17.57 miles on various roads in Tattnall County. The contractor will be given a 14-day notice to proceed. There will be a MANDATORY p…
Metts Road Drainage & Repairs Project
The Bulloch County Board of Commissioners is accepting sealed bids from GDOT Prequalified Contractors for this project: FY27-ENGCP-001-2 Metts Road Drainage & Road Repairs Project. The project consist…
FY2026 GTIB Paving Improvements
The project will consist of 3,446 SY of Graded Aggregate Base and driveway piping for a new road, 1,694 SY of variable depth milling, 938 SY of Full Depth Reclamation, 37 SY of patching, 3,343 Tons of…
POOLER PARKWAY AT BENTON BOULEVARD, MILL CREEK CIRCLE, AND I-95 SOUTHBOUND RAMPS POOLER.
The work will include all equipment, materials, supplies, labor, and all other costs associated with construction of approximately 3,725 linear feet of roadway. The roadway includes the modification o…
2026 LRA, 2027 LMIG, & T-SPLOST Paving Project
The work to be done consists of furnishing all materials and performing all labor necessary to complete the Hawkinsville 2026 LRA, 2027 LMIG, & T-SPLOST Paving Project that consists of resurfacing por…
Lamar County 2026 LMIG Resurfacing Project
This is an invitation to submit a bid to Lamar County for the 2026 LMIG-TSPLOST Project (Midway Road, Freeman Road, Shadybrook Lane, Ponderosa Lane and South 6th Street Ext.) as indicated herein. Seal…