Fire Station 100 Installation of Manual Transfer Switch
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The City of Miramar, Florida (“City”) is soliciting requests from a qualified contractor, hereinafter referred to as the Successful Bidder, to supply and install one (1) new 800A, 480-volt, 3-phase combination Manual Transfer Switch (MTS), complete with a weatherproof NEMA 3R UL-listed generator tap box equipped with built-in Cam-Lok receptacles at Fire Station 100 (FS100) at 2800 SW 184th Ave, Miramar, FL 33029 NON-MANDATORY NON-MANDATORY PRE-BID MEETING AND SITE VISIT: The City will hold a Pre-Bid Conference and Site Visit on Tuesday, August 25, 2026, at 11:00 AM at Fire Station 100 (FS100) at 2800 SW 184th Ave, Miramar, FL 33029
Similar open contracts
Fire Station 19 Installation of Manual Transfer Switch
Supply and install one (1) new 800A, 120/208V, 3-phase combination Manual Transfer Switch (MTS), complete with a weatherproof NEMA 3R UL-listed generator tap box equipped with built-in Cam-Lok recepta…
WATERMAIN REPAIR AND REPLACEMENT PROJECT
The City of Miramar is soliciting bids from qualified vendors/contractors to provide and furnish all material, equipment, and labor for their citywide watermain repair and replacement project .
D4-D6 MATERIALS AND RESEARCH OFFICE FIRE ALARM SYSTEM REPLACEMENT/UPGRADE
The Florida Department of Transportation requests competitive sealed bids, proposals, or replies (as indicated in the solicitation) for the procurement of D4-D6 MATERIALS AND RESEARCH OFFICE FIRE ALAR…
AMPHITHEATER NOISE REDUCTION
AMPHITHEATER NOISE REDUCTION IFB - Invitation for Bids NON-MANDATORY NON-WEBEX PRE-BID MEETING: The City will hold a non-mandatory pre-bid meeting via Webex at 11:00 a.m. with a site-visit scheduled…
POWER PLANT SWITCHGEAR & GENERATOR REPLACEMENT
POWER PLANT SWITCHGEAR & GENERATOR REPLACEMENT ITB - Invitation to Bid MANDATORY Mandatory Site Visit Friday, August 14, 2026 at 10:00 a.m. DuPage County Power Plant 410 N. County Farm Road Wheaton,…
Emergency Operations Center, Standby Generator Phase 2: Parallel UPS Installation
The City of Hialeah is soliciting bids from qualified and experienced contractors for a critical, turn-key power resilience project at the City of Hialeah Emergency Operations Center (EOC) and backup …