Site Modifications at the Palmyrita Water Treatment Plant for Pfas Removal
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
<p>The work to be done, in general, shall include furnishing all labor, materials, tools, equipment, and incidentals, unless otherwise specified, to construct the treatment plant complete in place in accordance with the Plans and Specifications. The Palmyrita Water Treatment Plant Site Modifications for PFAS Removal are summarized as follows:</p><p>1. Purchase, take delivery, and install IX Pressure Vessel systems at the Water Treatment Plant including pressure testing, disinfection, and bacteria testing.</p><p>2. Purchase, coordinate and assist with the installation of Ion Exchange (IX) media into IX pressure vessels.</p><p>3. Furnish and install a prefilter system for the Ion Exchange (IX) system.</p><p>4. Furnish and install Booster Pump Station.</p><p>5. Construct structural concrete at the Palmyrita Water Treatment Plant Site Modifications for PFAS Removal.</p><p>6. Connect to the Water Treatment Plant and to the distribution system. Furnish and install cement mortar lined and painted above ground piping, cement mortar lined and mortar coated below ground piping, epoxy lined and cement mortar coated below ground piping, and epoxy lined and painted above ground piping. Provide Traffic Control</p><p>7. Paving and Site Improvements, including grading, PCC paving, asphalt paving, stormwater</p><p>treatment and BMPs, block wall, driveway, access way, landscaping and irrigation replacement and drainage at the new water treatment plant.</p><p>8. Electrical and Instrumentation equipment and facilities at the new water treatment plant.</p><p>9. Furnish and install backup generator</p><p>10. Provide Commissioning and startup services.</p><p>11. Construction of the connection to the distribution system for treated water.</p><p>12. Construction of all control and instrumentation equipment and facilities including completing all programming and SCADA integration, and coordination of programming with RPU’s Instrumentation and Controls specialist.</p><p>13. Training and the p…