56 CS FOC to Flightline and Wx Equipment, Luke AFB
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The Government intends to hold a site visit for subject requirement on 4 November 2026 at 0900 AM. Below you will find the instructions and required documents to attend. Only SBA Certified Women Owned Small-Businesses are eligible for this requirement. **THIS IS THE ONLY DATE AND TIME FOR THE SITE VISIT, REQUESTS TO MAKE ANY CHANGES WILL BE DENIED** Attendance will be limited to 2 representatives for each contractor. To attend please provide the attached template (Site Visit Base Access_Template) completed with the below information, to rachel.tilley.1@us.af.mil, no later than 26 October 2026 at 1500 Arizona Time. Required Info: Last Name, First Name, DOB, US Citizen, License or ID#, State of Issue, Last 4 SSN To access the installation, the attendee will be required to have a REAL ID or Government Issued Passport. When submitting the above information, please include a copy of the form of ID to allow for Security Forces to verify if it meets the requirements. **QUESTIONS ARE DUE NO LATER THAN COB 22 OCTOBER 2026 at 1500 AZ time** ***FINALIZED Q&A Document will be posted with answers no later than 26 October 2026*** This SOW defines the requirement for the Contractor to Engineer, Furnish, Install and Test (EFI&T) new 12-Strand (St), Single Mode (SM) Fiber Optic Cable (FOC) from Radar Approach Control (RAPCON, B979) to Air Traffic Control Tower (ATCT, B998), Base Operation (Ops)B453), Command Post (CP, B11), Localizer (B1375), Glide Slope (GS, B1056), Tactical Air Navigation (TACAN, B1049), Ground Antenna Transmit and Receive (GATR, B1040), Glide Slope (B1081 and Localizer (B1059). Also, 12-St SM FOC from Base Ops (B453) to Primary and Secondary Automatic Meteorological Station (FMQ-19s). The work will be performed at Luke AFB AZ by using new and existing Manhole/Handhole Duct System. Some portion of the cable route/path will be Direct Buried. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and o…