Federal Contract

56 CS FOC to Flightline and Wx Equipment, Luke AFB

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

DEPT OF THE AIR FORCE

NAICS Code

335921

Set-Aside

WOSB

Department

DEPT OF DEFENSE

Solicitation Type

Combined Synopsis/Solicitation

Solicitation #

F3YCFA6173AC01

PSC Code

6145

Division

FA4887 56 CONS CC

Performance State

AZ

Posted

Tue, October 13, 2026

Response Deadline

Mon, November 9, 2026

Description

**QUESTIONS ARE DUE NO LATER THAN COB 19 OCTOBER** Depending on interest a site visit can be scheduled and proposal due date MAY shift to accommodate. This SOW defines the requirement for the Contractor to Engineer, Furnish, Install and Test (EFI&T) new 12-Strand (St), Single Mode (SM) Fiber Optic Cable (FOC) from Radar Approach Control (RAPCON, B979) to Air Traffic Control Tower (ATCT, B998), Base Operation (Ops)B453), Command Post (CP, B11), Localizer (B1375), Glide Slope (GS, B1056), Tactical Air Navigation (TACAN, B1049), Ground Antenna Transmit and Receive (GATR, B1040), Glide Slope (B1081 and Localizer (B1059). Also, 12-St SM FOC from Base Ops (B453) to Primary and Secondary Automatic Meteorological Station (FMQ-19s). The work will be performed at Luke AFB AZ by using new and existing Manhole/Handhole Duct System. Some portion of the cable route/path will be Direct Buried. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this SOW. All equipment, supplies, or materials provided shall be new and not refurbished. No equipment, supplies, or material will be provided by the government. All materials used in this SOW must be rust-proof and corrosion-resistant, due to the nature of the environment. See attached Solicitation and supporting documents for additional information.

Similar open contracts