Coleman Bridge HPU Integration
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
To modify the existing far side movable grating HPU starter box, install a new PLC control cabinet on Pier 1N and control cabinet on thefar side span lock platform, remove all of the existing fully seated movable grating limit switches, install new movable gratingfully seated limit switches at, install new fully raised movable grating limit switches and rotary cam limit switch at the far sidespan lock platform and integrate all of the new equipment into the existing PLC and control system.