Sacramento, CA

Municipal Groundwater Well Drilling Contractors

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

City of Sacramento

Solicitation #

Q26141311020

Department

DOU - Utilities Department

NIGP Code

96296

License Required

C-57

Preference Program

LBE has been Waived

Performance State

CA

Posted

Thu, October 29, 2026

Response Deadline

Thu, November 19, 2026

Description

<p>Firms responding to this RFQ shall provide statements of qualification in accordance with the requirements of Section B demonstrating their ability to drill and construct municipal groundwater production wells, test wells, and monitoring wells.</p><p>Future projects may include, but are not limited to, site preparation and mobilization; drilling; collection and documentation of drill cuttings; geophysical logging; installation of well casing, well screen, filter pack, annular seals, and sanitary seals; well development; installation and operation of temporary pumping equipment; pumping and aquifer testing; well disinfection; management and disposal of drilling fluids and other waste materials; site restoration; and other related work necessary to complete the wells.</p><p>Over the five-year period covered by this RFQ, the City currently anticipates constructing up to five production wells, five test wells, and five monitoring wells. Individual projects for which prequalified contractors may be invited to bid may include the construction of a single well or multiple wells. Based on current planning, future wells are anticipated to have casing diameters of 20 inches or less, borehole diameters of 48 inches or less, and depths ranging from approximately 500 to 1,500 feet. Construction estimates are anticipated to range from approximately $100,000 to $3,000,000 (reflecting project scopes that may range from a single shallow, small-diameter test well to multiple deep production wells), with construction performance periods ranging from approximately 90 to 180 working days. These quantities and ranges are preliminary, and actual project requirements may vary. The City will define the specific scope of work and bidding requirements for each project in separate plans, specifications, and bid documents issued to the applicable prequalified contractors. Establishment of the prequalified contractor list does not guarantee any contractor a minimum number of bid opportunities…

Similar open contracts