CONSTRUCTION INVITATION TO BID ISSUED BY: Department of Buildings & General Services REBID NORTHERN STATE CORRECTIONAL FACILITY (NSCF) FIRE PUMP REPLACEMENT ISSUE DATE: August 31, 2026 BIDDERS CONFERENCE: There will be a non-mandatory pre-bid meeting at the site on September 30, 2026 at 11:00 AM (EST). QUESTIONS DUE: October 7, 2026 – 4:30 PM (EST) RESPONSES DUE BY: October 14, 2026 – 4:30 PM (EST) STATE CONTACT: James Myers, State Senior Purchasing Agent E-MAIL : BGS.OPCVendorDocs@vermont.gov Contractors are invited to bid on the REBID Northern State Correctional Facility (NSCF) Fire Pump Replacement Project for Buildings and General Services at 2559 Glen Road in Newport, Vermont. This project consists of, but is not limited to: Scope of work includes the replacement and modification of the existing fire pump system and associated fire protection, electrical, and alarm components as indicated in the construction drawings and technical specifications, including but not limited to: 1. Replacement of the existing electric-driven fire pump with a new unit per drawing and specification. 2. Installation of a new jockey pump and associated components. 3. Demolition and modification of existing piping and equipment as required. 4. Reconfiguration of fire protection piping, valves, flow meter, and sensing lines. 5. Electrical and fire alarm modifications and reconnections. 6. Testing, commissioning, and startup of the fire pump system. 7. Preparation of submittals, closeout documentation, and training of Owner’s personnel. Blueprints, Etc. is the official source of information for documents concerning this Invitation to Bid. Documents may be obtained from Blueprints, Etc., 20 Farrell Street, South Burlington, VT 05403, by phone at 802.865.4503, by fax at 802.865.0027 or email to: orders@blueprintsetc.com. Project Manuals and Plans are available for preview at: http://www.blueprintsetc.com in the Private Plan Room. A password is required to access this project and may be obt…
Similar open contracts
AE NSCF Exhaust Fan Replacement
SEALED BID REQUEST FOR PROPOSAL Exhaust Fan Replacement Northern State Correctional Facility (NSCF) 2559 Glen Road, Newport, Vermont ISSUE DATE August 14, 2026 QUESTIONS DUE August 28, 2026 – 4:30 PM …
133 State Street – 326 Training Room Renovation
State of Vermont CONSTRUCTION INVITATION TO BID ISSUED BY: Department of Buildings & General Services 133 State Street – 326 Training Room Renovation ISSUE DATE: September 2, 2026 BIDDERS CONFERENCE: …
FCI Danbury - Replace Fire Pump
THIS IS A SYNOPSIS / SOLICITATION OF PROPOSED CONTRACT ACTION. THIS IS A SOLICITATION AND INVITATION FOR OFFERORS TO SUBMIT QUOTES. The Federal Bureau of Prisons (FBOP) has issued solicitation 15BBNF2…
FCI Danbury - Replace Fire Pump
THIS IS A SYNOPSIS / SOLICITATION OF PROPOSED CONTRACT ACTION. THIS IS A SOLICITATION AND INVITATION FOR OFFERORS TO SUBMIT QUOTES. The Federal Bureau of Prisons (FBOP) has issued solicitation 15BBNF2…
Bonneville Powerhouse II Unwatering Pump Replacement
The U.S. Army Corps of Engineers (USACE) Portland District (NWP) has a requirement for Unwatering Pump Replacement at the Bonneville Lock and Dam Powerhouse II. Contractor access to the work site will…
Bonneville Powerhouse II Unwatering Pump Replacement
The U.S. Army Corps of Engineers (USACE) Portland District (NWP) has a requirement for Unwatering Pump Replacement at the Bonneville Lock and Dam Powerhouse II. Contractor access to the work site will…