Bonneville Powerhouse II Unwatering Pump Replacement

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

DEPT OF THE ARMY

NAICS Code

237990

Set-Aside

SBA

Department

DEPT OF DEFENSE

Solicitation Type

Presolicitation

Solicitation #

W9127N26BA018

PSC Code

Z2KA

Division

W071 ENDIST PORTLAND

Performance State

WA

Posted

Fri, August 21, 2026

Description

The U.S. Army Corps of Engineers (USACE) Portland District (NWP) has a requirement for Unwatering Pump Replacement at the Bonneville Lock and Dam Powerhouse II. Contractor access to the work site will be from Interstate 84 on the Oregon side of the Columbia River via Exit 40, approximately four miles west of Cascade Locks, Oregon. All work for this project is in Skamania County, Washington. Cybersecurity Maturity Model Certification (CMMC). This solicitation requires the contractor and or subcontractor(s) information system to process, store, or transmit Federal Contract Information (FCI), and requires the contractor and or subcontractor(s) to comply with CMMC requirements. The CMMC level required by this solicitation is: CMMC Level 1 (Self). This CMMC level, or higher, is a condition of award. Prior to award, the apparent successful bidder must have a current CMMC status at Level 1 (Self), or higher, posted in SPRS for each relevant CMMC UID in order to remain eligible for award; failure to meet this requirement will render the bidder ineligible for contract award.CMMC requirements apply to prime contractors and subcontractors throughout the supply chain at all tiers that will process, store, or transmit any FCI on contractor information systems in the performance of this contract or subcontract. Prime contractors shall comply and shall require subcontractors to comply with and to flow down CMMC requirements, such that compliance will be required throughout the supply chain at all tiers with the applicable CMMC level and assessment type for each subcontract as follows:If a subcontractor will not process, store, or transmit FCI in performance of the subcontract, then no CMMC level is required for that subcontractor. If a subcontractor will only process, store, or transmit FCI in performance of the subcontract, then a CMMC status of Level 1 (Self) is required for that subcontractor.Prime contractors are responsible for ensuring that all covered subcontractors obtain …