Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The project consists of replacing the existing bridge with a new fixed bridge on a new alignment and to provide for partial demolition of the existing bridge. The new fixed bridge will be a single-span steel girder bridge with a concrete deck. The bridge width will be 34�4�� out-to-out, with two 11�0� travel lanes, two 2�0� shoulders, a 5�0� sidewalk, and the superstructure will consist of four (4) built-up steel plate girders. The replacement bridge alignment is located immediately downstream of the existing bridge and, at its northern terminus, will fit entirely between the existing bridge and the Bonneville Power Administration transmission tower which is located to the south. Approach roadways will also be constructed to tie into the existing roadway alignment. The new fixed bridge will be located over the existing navigation channel and will provide an under clearance that is larger than is currently present under the existing bridge. The north abutment will be a concrete stub abutment with spread footing anchored into rock. The south abutment will be a concrete abutment that is supported by drilled shafts. To mitigate seismic hazards, portions of the existing bridge will be removed as part of the bridge construction requirement. The existing bridge provides for critical vehicular access to the Bonneville project that must remain open for the entirety of the construction project. This will likely require the contractor to construct the project in phases. In addition, lead and asbestos removal will be required as part of this requirement. Working within environmental and seasonal restrictions and barge crane lifting will be required in close proximity to a high voltage power line will also be necessary during performance of the required work.
Similar open contracts
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
27 August 2026 - Amendment W9127N26BA0240001 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement This amendment inserts additional Government Furnished Information (GFI) as an attachment to…
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
27 August 2026 - Amendment W9127N26BA0240001 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement This amendment inserts additional Government Furnished Information (GFI) as an attachment to…
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
03 September 2026 - Amendment W9127N26BA0240002 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement This amendment effects changes to block 13 of Standard Form 1442, the Solicitation Specif…
CO NP ROMO 407(1) Holzwarth Culvert
THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE PROJECT NUMBER: CO NP ROMO 407(1) PROJECT NAME: Holzwarth Culvert PROJECT DESCRIPTION: This project will replace the defici…
LOCK AND DAM 25 NEW 1,200 FT LOCK NAVIGATION AND ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)
NESP LD25 1200 ft Lock The new lock at Lock 25 will be constructed in the downstream direction in the auxiliary miter gate bay, which has minimum provisions for an adjacent 360-foot-long lock and is r…
Bonneville Powerhouse II Unwatering Pump Replacement
The U.S. Army Corps of Engineers (USACE) Portland District (NWP) has a requirement for Unwatering Pump Replacement at the Bonneville Lock and Dam Powerhouse II. Contractor access to the work site will…