25214 - Central Energy Plant - Chiller #2 Replacement
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The work under this project consists of the replacement of the existing Chiller #2 at the City of Norfolk Central Plant. This includes the removal of the exiting nominal 660 ton chiller and the installation of a new chiller (of similar size), new flow control devices and controls.
Similar open contracts
Z1DA--Upgrade Chiller Plant Construction Northport - Project 632-25-101
Work includes general construction and alterations, of the existing chiller plant and includes the necessary removal of existing building components, systems, construction and installation of certain …
NETC Cheraw Campus - Boiler/Chiller Upgrades
Provide and install piping and power for owner provided and installed modular boiler/chiller plant and cooling tower. Connect piping from plant to existing piping serving three campus buildings.
Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT
The scope of the chilled water plant replacement consists of the demolition of the existing chilled water plant (building 16a) and construction of a new multi-story chilled water plant to include chil…
Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT
The scope of the chilled water plant replacement consists of the demolition of the existing chilled water plant (building 16a) and construction of a new multi-story chilled water plant to include chil…
Replace Chiller 2, B500
Project Title: Replace Chiller 2, B500 Description: This requirement consists of removing the existing chiller located in the basement level of B500 and installing a brand-new, fully operational repla…
Replace Chiller 2, B500
Project Title: Replace Chiller 2, B500 Description: This requirement consists of removing the existing chiller located in the basement level of B500 and installing a brand-new, fully operational repla…