Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The scope of the chilled water plant replacement consists of the demolition of the existing chilled water plant (building 16a) and construction of a new multi-story chilled water plant to include chillers, cooling towers, pumps, and all associated mechanical and electrical equipment. Due to the close proximity of the existing fuel tank farm adjacent to the existing chilled water plant, a new fuel tank farm will need to be constructed as part of the project, which primarily serves the central boiler plant, requiring close coordination with the medical center and ongoing related projects.The scope of the site utility upgrades consists of the replacement and upgrade of the existing fire protection water main and the domestic water main from Campbell Avenue to Building 15. Site utility upgrades also include providing utility main loops of chilled water supply and return, steam supply, condensate return, domestic water supply, and fire protection water supply which will originate from the new chilled water plant and back-feed to Building 1. The work also includes the installation of redundant electrical feeder from the utility demarcation point to Building 19 and coordination with the local electrical utility provider to provide further electrical redundancy offsite as well. In addition, new water storage tanks will be constructed. This project involves civil/site, mechanical, electrical, plumbing, structural, geotechnical, and architectural disciplines. The project must also comply with the DVAs Physical Security Resiliency Design Requirements (PSRDM). It is expected that the chilled water plant will be constructed to meet USGBC LEED Silver certification. The work is located adjacent to and within an active Medical Center campus which will be operational at all times. Impact to on-going operations must be kept to a minimum and carefully coordinated with the Contracting Officer and VAMC staff. In addition, the work area is constrained due to the active medical center ope…
Similar open contracts
Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT
The scope of the chilled water plant replacement consists of the demolition of the existing chilled water plant (building 16a) and construction of a new multi-story chilled water plant to include chil…
Z1DA--Upgrade Chiller Plant Construction Northport - Project 632-25-101
Work includes general construction and alterations, of the existing chiller plant and includes the necessary removal of existing building components, systems, construction and installation of certain …
Z1DZ--556-24-106 CON: Replace Chiller No. 02 Re-Solicitation
Pre-Solicitation Notice Solicitation: 36C25226B0040 Project: 556-24-106 Replace Chiller No. 02 Location: Captain James A. Lovell Federal Health Care Center (FHCC) 3001 Breen Bay Road North Chicago, IL…
Z2NZ--659-24-203: Extend Chilled Water to Hospice and Audiology
Provide chilled water from the building 31 primary chiller to serve Buildings 42 and 43, bypassing the existing chillers in 42 and 43 during normal operation. Normal Operation (Primary from Building 3…
Z2NZ--659-24-203: Extend Chilled Water to Hospice and Audiology
Provide chilled water from the building 31 primary chiller to serve Buildings 42 and 43, bypassing the existing chillers in 42 and 43 during normal operation. Normal Operation (Primary from Building 3…
Z2DA--589-24-450, Upgrade BLDG 26 Chillers l KCVA (VA-26-00063880) FY26 NRM OS
Sources Sought Notice Sources Sought Notice Sources Sought Notice *= Required Field Sources Sought Notice Project 589-24-450, Upgrade Bldg. 26 Chillers This is a Sources Sought Notice to determine the…