Replacement of fire alarm initiating devices and wires
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
Contractor shall provide all labor, materials, equipment, supplies and supervision to perform the following work: Replacement of fire alarm initiating devices and wires in Building 100, DLA Distribution San Joaquin CA (DDJC), Tracy Site, 25600 South Chrisman Rd, Tracy CA 95304. The following summary of work is for the purpose of general information and is not intended to include and describe every feature or item or to define the scope of work. It is expected that the contractor will visit the site of work and thoroughly familiarize himself with the conditions existing there. Failure on the part of the contractor to acquaint himself with the site conditions will not be sufficient reason for any increase in contract price. �� Replace existing Apollo-Series software protocol devices with new Velociti-Series addressable devices. �� Replace conventional initiating circuit copper wiring with new addressable communication cables. �� Replace existing fire sprinkler flow & tamper switches monitor modules with new Velociti-series addressable devices. �� Replace all existing manual pull stations with new Velociti-series addressable stations. �� Replace all existing smoke, duct & heat detection devices with new Velociti-series addressable devices. �� Provide all device circuit terminations, final connections, testing, labeling as required. �� Provide submittals, as-built drawings, test reports, guarantees & closeouts as required for approvals. Perform final programming, provide operator/ maintenance manuals & training services. �� Provide programming of all devices. All work shall be performed complete and in accordance with the specifications, drawings and solicitation requirements. Period of Performance: Contractor shall commence work upon receipt of the Notice to Proceed (NTP) and complete the entire work ready for use within 120 calendar days from receipt of the NTP. The work to be performed shall be during the regular working hours. Contractor's working hours, which do no…
Similar open contracts
Paint Exteriors of warehouses
Contractor shall provide all labor, materials, equipment, supplies and supervision to perform the following work: Paint Exteriors of warehouses 14, 15, 17 and 18, DLA Distribution San Joaquin CA (DDJC…
183 CES Repair Base Fire Alarm System
The 183d Wing, Illinois Air National Guard (ANG), intends to issue an Invitation for Bid to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transporta…
Repair Building 3002 Fuel Cell Hangar
Pre-Solicitation Notice Invitation for Bids (IFB) Small Business Set Aside NAICS Code: 236220 - Commercial and Institutional Building Construction. The District of Columbia Air National Guard intends …
Construction of Fire Protection System at Building C2 at Naval Weapons Station Earle, NJ
PRE-SOLICITATION NOTICE UPDATE AS OF 8/20/2026 - The formal SF1442 Solicitation will be posted to SAM.gov no later than Monday, 24 August 2026 with a proposal due date of 30 September 2026. - Site Vis…
M-EH IMPROVED BRADLEY ACQUISITION SUBSYSTEM (IBAS) - ADD
The purpose of amendment 0001 for solicitation SPRRA226R0071 is to change the proposal due date from 11 August 2026 to 6 October 2026 & add attachment 0008 CFTA TEST PLAN 070626. All other terms and c…
valve, fuel shut-off, 4810-01-084-5981
AMENDMENT to update solicitation opening and closing dates. SOLICITATION ISSUE DATE: 09/01/2026 SOLICITATION CLOSE DATE: 10/01/2026 Defense Logistics Agency (DLA) Weapons Support - Columbus DLA Weapon…