Federal Contract

Paint Exteriors of warehouses

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

DEFENSE LOGISTICS AGENCY

NAICS Code

238320

Set-Aside

SBA

Department

DEPT OF DEFENSE

Solicitation Type

Presolicitation

Solicitation #

SP3300-16-B-0016

Division

DLA DISTRIBUTION

Performance State

CA

Posted

Wed, July 13, 2016

Description

Contractor shall provide all labor, materials, equipment, supplies and supervision to perform the following work: Paint Exteriors of warehouses 14, 15, 17 and 18, DLA Distribution San Joaquin CA (DDJC), Tracy Site, 25600 South Chrisman Rd, Tracy, CA 95304. The following summary of work is for the purpose of general information and is not intended to include and describe every feature or item or to define the scope of work. It is expected that the contractor will visit the site of work and thoroughly familiarize himself with the conditions existing there. Failure on the part of the contractor to acquaint himself with the site conditions will not be sufficient reason for any increase in contract price. �1. Project Description: This project is required to repaint the exterior surfaces of four warehouses including surface preparation, primer (where required), and finish coats of paint. The project includes the following work: �a. Repaint concrete walls, exposed metal gas piping, exposed metal piping, metal gutters, metal downspouts, louvers, metal railings and dock stairs, wood dock bumpers, wood trims, wood doors, metal siding, metal pipe bollards, metal ladders, metal personnel doors and frames, metal trims, wooden cargo doors, wood window frames, canopies, and sprinkler system piping under canopies. �b. Repaint sliding and roll-up cargo doors, except those identified on the drawings. �c. Repaint fire department connections (FDC) markings with red paint (4" wide lines and FDC lettering). �d. Replace damaged caulking and sealant. �e. Replace abrasive strips on concrete dock stairs. �f. Remove and dispose of lead-based paint, as required from surface preparation. All work shall be performed complete and in accordance with the specifications, drawings and solicitation requirements. Period of Performance: Contractor shall commence work upon receipt of the Notice to Proceed (NTP) and complete the entire work ready for use within 240 calendar days from receipt of the NTP. T…

Similar open contracts