California

26-30612-000 - West Perimeter Bridge

See the original posting, the buyer’s contact details, and thousands more contracts like this one

Free account. Already have one? Log in

Get started

Agency

Department of State Hospitals

Performance State

CA

Posted

Fri, September 11, 2026

Response Deadline

Tue, October 20, 2026

Description

Contractor shall provide all necessary materials, supplies, tools, equipment, transportation, licenses, permits, prevailing wages, insurance, bonds, and personnel/labor to complete the replacement of the existing West Perimeter Vehicle Bridge at DSH Patton in conformity with the Drawings and Specifications hereinafter identified. Work shall include demolition and removal of the existing bridge structure and associated site elements, installation of a new vehicle bridge, construction of ADA-compliant warning curbs as indicated on the contract drawings, removal and relocation/protection of existing water lines as required, and reconstruction of pavement and approach transitions on both sides of the bridge to achieve proposed grades.

Similar open contracts