BAHIA GRANDE HABITAT RESTORATION PROJECT BROWNSVILLE, TEXAS
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The project is located within the Bahia Grande Unit of the Laguna Atascosa National Wildlife Refuge in Cameron County, Texas. Base work generally includes mobilization/ demobilization, construction of off-loading pad, restoration of existing boat ramp for marine access, and placement of turbidity curtains, and open water transport and installation of pre-constructed Ultra Reef Balls for breakwater shoreline protection at Rookery Islands A and B. Additive Alternate No. 1 includes placement of turbidity curtains and open water transport and installation of pre-constructed Ultra Reef Balls for breakwater shoreline protection at Rookery Island C. Additive Alternate No. 2 includes construction of an alternate access road. No dredging activities are permitted for this project. Seagrass shall not be damaged or impacted as part of this project. Owner will construct/manufacture Reef Balls under separate cover and stockpile at staging area. Owner will construct/improve the main access road to reef ball staging area. Contractor will collect pre-constructed Reef Balls from the stockpile location and provide transportation across shallow open water to the islands for installation and install according to construction drawings. All questions shall be submitted to Scheibe Consulting, LLC to the attention of Eric Scheibe, escheibe@scheibeconsulting.com. Rosario Martinez (rmartinez@cbbep.org) and Marisa McKnight (mmcknight@scheibeconsulting.com) shall be cc’d on all questions. The deadline for questions will be 5:00 pm on August 27, 2026 and responses will be provided by 5:00 pm on September 1, 2026. A digital (PDF) copy of the bid package may be obtained from Scheibe Consulting, LLC. Contact Marisa McKnight at (512) 990-7226, mmcknight@scheibeconsulting.com, for instruction on how to obtain the bid documents.