Fort Pierce Harbor Maintenance Dredging, St. Lucie County, Florida
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
DESCRIPTION OF WORK: The U.S. Army Corps of Engineers, Jacksonville District, intends to issue an Invitation for Bid (IFB) to award a single firm fixed-price contract. Project work includes maintenance dredging of Fort Pierce Harbor with excavated material being placed onto Fort Pierce Beach. Due to the extensive hardbottom areas located offshore of the fill area, offshore pipeline access to the beach site is prohibited. Offloading the beach fill will be done inside the South Jetty of Fort Pierce Inlet, as shown on the drawings. A staging area and beach access to the beach placement area are located at the end of Seaway Drive and near the south jetty pumpout location. Work also includes but is not limited to environmental and water quality monitoring, sea turtle trawl sweeping (hopper dredges only), screening, beach tilling, beach fill quality control, construction support, and vibration control and monitoring. Work will be divided into a base and two options. A pre-bid site visit will be held on Monday, 28 September 2026 at 10:00 AM EDT. Refer to Site Visit in Section 00 73 00 of the Specifications for additional details regarding location and registration instructions. A pre-bid conference will also be held virtually on Tuesday, 29 September 2026 at 10:00 AM EDT. Utilize the following link and call-in information Microsoft Teams Meeting: HTTPS://WWW.MICROSOFT.COM/EN-US/MICROSOFT-TEAMS/JOIN-A-MEETING Meeting ID: Meeting ID: 993 213 964 588 | Passcode: qQ9LT3zi Dial-In: +1 601-262-2433 | Passcode: 453 007 326#. NAICS Code is: 237990, Dredging and Surface Cleanup Activities The Small Business Standard is $37 million. The Estimated Magnitude of construction is between $5,000,000 and $10,000,000. The anticipated period of performance associated with this requirement is: The Contractor shall be required to (a) commence work under this contract within SIXTY (60) calendar days after the date the Contractor receives the Notice to Proceed (NTP), (b) prosecute the work dilig…