COVB-27-101709 ITB for five Town Center parking garages to include structural and waterproofing
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The scope of work includes structural and waterproofing repairs to be performed on the Green â Armada Hoffler Parking Garage, Red â Westin Parking Garage, Blue â Cosmopolitan Parking Garage, Orange â Clark Nexsen Garage, and Maroon Parking Garage. Contractor is responsible for work incidental to the repairs, including, but not limited to, repainting traffic markings, use of temporary shoring devices, use of temporary traffic control measures, and protection of persons and property is also included in this project.
Similar open contracts
IFB #27-ODU-03-MRP VHS EVMS Visitor Garage Stair Repairs
The Scope of Work shall consist of and is generally described as stair repairs within the parking structure, asdetailed by structure to include: concrete repairs, routing and sealing cracks and constr…
IFB 260017835 Limited Structural Repairs for Seventh and Marshall Garage
The City of Richmond is accepting bids for select repairs of the parking garage located at 607 E. Marshall Street in Richmond, Virginia. Repairs include, but are not limited to, partial and full depth…
ITB 27-16TM Structural Repairs to 100 Exploration WAy
The City of Hampton is seeking bids from qualified bidders to provide structural repair renovations to 100 Exploration Way in Hampton
ITB No. 26-2989-8EAR - Water Treatment Facility - HVAC Improvements
The Work consists of all work required by the Construction Documents necessary for the HVAC Improvements project at the Henrico County Department of Public Utilitiesâ Water Treatment Facility (WTF) …
AMC-0174 OWB ATCT Public Announcement
Project electrical work consists of rerouting down conductors, ground tests, arc flash study, and SPD replacement. Roof work includes replacing 3 roofs (CAB and shaft) with EPDM membrane, replacing ro…
ITB: Mason Mill Waterline Extension
The Project consists of: Approximately 2,340 linear feet of 8â waterline, reconnection of approximately 23 water services, 1 Pressure reducing valve vault, 3 fire hydrants, and all related appurtena…