Agency

DEPT OF THE ARMY

NAICS Code

237110

Department

DEPT OF DEFENSE

Solicitation Type

Solicitation

Solicitation #

W911XK26BA028

PSC Code

Y1NZ

Division

W072 ENDIST DETROIT

Performance State

MI

Posted

Fri, September 11, 2026

Response Deadline

Fri, September 25, 2026

Extended to Oct 20, 2026 by a later notice

Description

***Amendment 0001 is being issued on September 11, 2026. The Bid Inquiry will remain closed at this time, and will be reopened upon the issuance of a forthcoming amendment. *** The U.S. Army Corps of Engineers (USACE) Detroit District, in partnership with the Macomb County Public Works (MCPW), is seeking contractors for a Firm-Fixed-Price (FFP) construction contract for the 9-Mile Pump Station project located in St. Clair Shores, Macomb County, Michigan. The project entails constructing a new 9-Mile Pump Station to separate the 8-1/2 Mile Relief Drain from the 9-Mile Drain. Operating under an 880-day Period of Performance, this effort is designed to significantly reduce flood risks for southeast Michigan residents and better protect the water quality of Lake St. Clair.

Notice history (7)

  1. Jul 14, 2026Presolicitation

    THIS IS A PRE-SOLICITATION NOTICE. THIS IS NOT A REQUEST FOR PROPOSAL OR INVITATION FOR BID. The U.S. Army Corps of Engineers (USACE) Detroit District, in partnership with the Macomb County Public Works (MCPW), is seeking contractors for a Firm-Fixed-Price (FFP) construction contract for the 9-Mile Pump Station project located in St. Clair Shores, Michigan. The proposed project consists of constructing a combined sewer overflow pump station with a pumping capacity of 615 cubic feet per second (cfs) with coarse screening, passive odor control, and backup power tied into the Chapaton Pump Station. The contractor will provide all materials, labor, equipment, supervision, and administration as necessary to perform the required work which is anticipated to include, but is not limited to, demolition, rerouting and connection of utilities, grading, excavation, steel pile foundation, connecting to existing, active, high-capacity storm sewers, constructing a single-story, pumphouse, site restoration, etc. General Information: The Government intends to solicit this opportunity as an Invitation for Bid (IFB) on a Full and Open Competition basis with a resultant award of a FFP construction contract for the requirement. A bid bond is required. The North American Industrial Classification System (NAICS) code is 237110 Water and Sewer Line and Related Structures Construction, which has a small business size standard of $45 million in average annual receipts. Approximate Solicitation Posting

Show 3 earlier notices
  1. Aug 6, 2026SolicitationDue Sep 17, 2026

    The U.S. Army Corps of Engineers (USACE) Detroit District, in partnership with the Macomb County Public Works (MCPW), is seeking contractors for a Firm-Fixed-Price (FFP) construction contract for the 9-Mile Pump Station project located in St. Clair Shores, Macomb County, Michigan. The project entails constructing a new 9-Mile Pump Station to separate the 8-1/2 Mile Relief Drain from the 9-Mile Drain. Operating under an 880-day Period of Performance, this effort is designed to significantly reduce flood risks for southeast Michigan residents and better protect the water quality of Lake St. Clair.

  2. Sep 11, 2026SolicitationDue Sep 25, 2026Viewing
  3. Sep 18, 2026SolicitationDue Oct 2, 2026

    ****Amendment 0002 is being issued on September 18, 2026. The Bid Inquiry will remain closed at this time, and will be reopened upon the issuance of a forthcoming amendment.**** ***Amendment 0001 is being issued on September 11, 2026. The Bid Inquiry will remain closed at this time, and will be reopened upon the issuance of a forthcoming amendment. *** The U.S. Army Corps of Engineers (USACE) Detroit District, in partnership with the Macomb County Public Works (MCPW), is seeking contractors for a Firm-Fixed-Price (FFP) construction contract for the 9-Mile Pump Station project located in St. Clair Shores, Macomb County, Michigan. The project entails constructing a new 9-Mile Pump Station to separate the 8-1/2 Mile Relief Drain from the 9-Mile Drain. Operating under an 880-day Period of Performance, this effort is designed to significantly reduce flood risks for southeast Michigan residents and better protect the water quality of Lake St. Clair.

  1. Sep 24, 2026SolicitationDue Oct 15, 2026

    ****Amendment 0003 is being issued on September 24, 2026. The bid inquiry is reopen until October 01, 2026. ***Amendment 0002 is being issued on September 18, 2026. The Bid Inquiry will remain closed at this time, and will be reopened upon the issuance of a forthcoming amendment.**** ***Amendment 0001 is being issued on September 11, 2026. The Bid Inquiry will remain closed at this time, and will be reopened upon the issuance of a forthcoming amendment. *** The U.S. Army Corps of Engineers (USACE) Detroit District, in partnership with the Macomb County Public Works (MCPW), is seeking contractors for a Firm-Fixed-Price (FFP) construction contract for the 9-Mile Pump Station project located in St. Clair Shores, Macomb County, Michigan. The project entails constructing a new 9-Mile Pump Station to separate the 8-1/2 Mile Relief Drain from the 9-Mile Drain. Operating under an 880-day Period of Performance, this effort is designed to significantly reduce flood risks for southeast Michigan residents and better protect the water quality of Lake St. Clair.

  2. Oct 7, 2026SolicitationDue Oct 20, 2026

    ****Amendment 0004 is being issues on October 7, 2026. Bid due date is extended to October 20, 2026 at 2:00pm (ET)****Amendment 0003 is being issued on September 24, 2026. The bid inquiry is reopen until October 01, 2026. ***Amendment 0002 is being issued on September 18, 2026. The Bid Inquiry will remain closed at this time, and will be reopened upon the issuance of a forthcoming amendment.**** ***Amendment 0001 is being issued on September 11, 2026. The Bid Inquiry will remain closed at this time, and will be reopened upon the issuance of a forthcoming amendment. *** The U.S. Army Corps of Engineers (USACE) Detroit District, in partnership with the Macomb County Public Works (MCPW), is seeking contractors for a Firm-Fixed-Price (FFP) construction contract for the 9-Mile Pump Station project located in St. Clair Shores, Macomb County, Michigan. The project entails constructing a new 9-Mile Pump Station to separate the 8-1/2 Mile Relief Drain from the 9-Mile Drain. Operating under an 880-day Period of Performance, this effort is designed to significantly reduce flood risks for southeast Michigan residents and better protect the water quality of Lake St. Clair.

  3. Oct 14, 2026SolicitationDue Oct 20, 2026

    ****Amendment 0005 is being issued on October 14, 2026. The bid due date will remain October 20, 2026 at 2:00pm (Eastern) with corresponding bid opening at 2:30 PM (Eastern) the day bids are due. ****Amendment 0004 is being issued on October 7, 2026. Bid due date is extended to October 20, 2026 at 2:00pm (ET)****Amendment 0003 is being issued on September 24, 2026. The bid inquiry is reopen until October 01, 2026. ***Amendment 0002 is being issued on September 18, 2026. The Bid Inquiry will remain closed at this time, and will be reopened upon the issuance of a forthcoming amendment.**** ***Amendment 0001 is being issued on September 11, 2026. The Bid Inquiry will remain closed at this time, and will be reopened upon the issuance of a forthcoming amendment. *** The U.S. Army Corps of Engineers (USACE) Detroit District, in partnership with the Macomb County Public Works (MCPW), is seeking contractors for a Firm-Fixed-Price (FFP) construction contract for the 9-Mile Pump Station project located in St. Clair Shores, Macomb County, Michigan. The project entails constructing a new 9-Mile Pump Station to separate the 8-1/2 Mile Relief Drain from the 9-Mile Drain. Operating under an 880-day Period of Performance, this effort is designed to significantly reduce flood risks for southeast Michigan residents and better protect the water quality of Lake St. Clair.