St. Lucie County Airport Water Main Extension
See the original posting, the buyer’s contact details, and thousands more contracts like this one
Free account. Already have one? Log in
Description
The St. Lucie County Airport Water Main Extension Project consists of the construction of approximately 3,150 lineal feet of 8” DR-18 C900 PVC / 8” Ductile Iron Class 350 pipe from the intersection of Airman’s Drive and Crosswind Drive, south to the intersection of Crosswind Drive and Tailwind Drive. From there, approximately 900 feet east to the North Tailwinds Drive, then 900 feet north. The project will provide fire protection and water service capabilities to the southwestern properties of the Treasure Cost International Airport. Construction consists of but not limited to utilities exploration; coordination with any permitting agencies; trenching; dewatering; restrainers; soil compaction; testing; traffic control; and any and all necessary items to produce operational systems as required by FDEP and St. Lucie County Regulations. All construction and material shall be per St. Lucie County Latest Standards. MANDATORY A MANDATORY pre-bid conference will be held Wednesday, September 9, 2026, at 10:00 A.M in the Conference Room 3 located on the 3rd Floor of the Roger Poitras Annex, 2300 Virginia Avenue, Ft. Pierce, Florida. At this time, the ENGINEER will be available to answer questions concerning the project
Similar open contracts
Edwards Road over 5-Mile Creek Bridge Repairs
MANDATORY A MANDATORY pre-bid conference will be held on Wednesday, August 19, 2026 at 1:30 P.M. in the Conference Room of the St. Lucie County Engineering Division, 2nd Floor, 2300 Virginia Avenue, F…
Rehabilitate Taxiway A and Intersections A/C and B/E
NON-MANDATORY PRE-BID CONFERENCE will be held at the Treasure Coast International Airport, Airport Administration Building, 2850 Curtis King Blvd, Ft. Pierce, Florida, 34946, on Tuesday, September 1, …
Tropical Farms Water Treatment Plant Expansion
Martin County is seeking proposals from licensed and experienced Contractors to furnish all labor, materials, equipment, and services necessary to expand the existing Tropical Farms Water Treatment Fa…
US HIGHWAY 1 - 12” WATER MAIN EXTENSION
The work to be done consists of the following approximate quantities: 14,102 LF of 12" DIP Water Main, 2,476 LF of 12" RJ DIP Water Main, 170 LF of 12" RJ DIP Water Main Installed in Casing, 134 LF of…
FOUR MILE ROAD & SR 16 INTERSECTION IMPROVEMENTS FDOT - FPN #210253-9-54-01
FOUR MILE ROAD & SR 16 INTERSECTION IMPROVEMENTS FDOT - FPN #210253-9-54-01 SB - Sealed Bid NON-MANDATORY Non-Mandatory Pre-Bid Meeting on Tuesday, July 21, 2026 at 1:00 PM EST in the Public Works M…
Airport Road Wastewater Improvements (61WW2101C)
The major work shall generally consist of but is not limited to all labor, materials, equipment, appurtenances, and incidentals as required to properly install, complete and be accepted in place the A…